Stadt Ulm | Germany | Ulm | Permanent position | Part time - flexible / Full time | Published since: 25.04.2025 on stepstone.de
Civil Engineer Project Team B10 (m/w/d)
Our city administration is as strong as the totality of its employees (m/w/d). Become part of our team and actively participate in Ulm. We are looking at the Department of Transport Planning and Road Construction, Green Areas, Surveying in Division B 10 Wallstrasse Bridge/ Blaubeurer Tor Tunnel from now on Projektteam B10 (m/w/d) Full time, unlimited The renewal of the B 10 in Ulm is the largest infrastructure construction measure in the city. By the beginning of the Landesgartenschau 2030 two large bridges with more than 17,000 m2 and a roundabout with more approx. 25,000 m2 and a total traffic load of more than 130,000 Kfz/ 24 hours replaced by a bridge, a tunnel and two signaled intersections. As a result of the importance of this measure, it is supported for an infrastructure measure with the highest funding amount of the Tübingen government office to date. In addition, this measure will be used for the first time in Baden-Württemberg for a transport infrastructure measure. Payment is made up to 12 TVöD. JOBV1_EN
* After clicking the 'Read more' button, the original advert will open on our partner's website, where you can see the details of this vacancy and contact information. If you need a translation of this text, after returning to our website it will be prepared and you can read it by clicking the 'Translation' button.
Our city administration is as strong as the totality of its employees (m/w/d). Become part of our team and actively participate in Ulm. We are looking at the Department of Transport Planning and Road Construction, Green Areas, Surveying in Division B 10 Wallstrasse Bridge/ Blaubeurer Tor Tunnel from now on Projektteam B10 (m/w/d) Full time, unlimited The renewal of the B 10 in Ulm is the largest infrastructure construction measure in the city. By the beginning of the Landesgartenschau 2030 two large bridges with more than 17,000 m2 and a roundabout with more approx. 25,000 m2 and a total traffic load of more than 130,000 Kfz/ 24 hours replaced by a bridge, a tunnel and two signaled intersections. As a result of the importance of this measure, it is supported for an infrastructure measure with the highest funding amount of the Tübingen government office to date. In addition, this measure will be used for the first time in Baden-Württemberg for a transport infrastructure measure. Payment is made up to 12 TVöD.
Project management and superstructure management to LBO in construction measures with special difficulty in engineering and civil engineering Coordination of all project participants Support and representation of project management Documentation of measures and provision and verification of documents as other services for third parties
a degree in civil engineering (Diplom, Bachelor, Master), with a focus on construction well-founded knowledge of project management in responsible position knowledge of the relevant regulatory framework (e.g. HOAI, VOB, etc.) and a pronounced technical understanding Own initiative and enforcement capability as well as pronounced communicative skills willingness to also execute services outside regular working hours
a discounted German ticket for the use of public transport between the apartment and the workplace Service wheel leasing Lunch table in selected gastronomy and canteen farms against a small share cheap tickets to urban facilities (Schwimmbad, Tiergarten, Museums) and much more JOBV1_EN
Company location
Location
![]() | Stadt Ulm | |
89073 Ulm | ||
Germany |
The text of this ad was translated from German into English using an automatic translation system and may contain semantic and lexical errors. Therefore, it should be used for introductory purposes only. For more detailed information, see the original text of the ad at the link below.
For more information read the original ad