0
Piening GmbH | Germany | 27804 Berne | Published since: 21.06.2026 on stepstone.de


Your tasks • Your profile • What we offer

Production of individual parts according to technical drawings Installation and operation of machinery and equipment Mass controls and quality checks (yes, accuracy really counts ) Documentation of work steps Working with improvements in the manufacturing process

Experience in metalworking or manufacturing of advantage Technical understanding and safe handling of drawings care, reliability and a calm head, when it comes to the tenth of a millimeter Team skills readiness for early and possibly Two-layered work

Safe workplace in production No one is thrown into cold metal water Team with direct communication Fair, planable 37-hour week Structured processes instead of chaos screwing

Contact

ava Piening GmbH
27804  Berne
Germany
show e-mail

The text of this ad was translated from German into English using an automatic translation system and may contain semantic and lexical errors. Therefore, it should be used for introductory purposes only. For more detailed information, see the original text of the ad at the link below.

For more information read the original ad

Permanent link to this ad

Ad Id