0Factory Optimization and Control Specialist d/f/m
RWE Nuclear GmbH | Germany | 68xxx Biblis | Temporary contract | Full time | Published since: 26.02.2026 on stepstone.de

Factory Optimization and Control Specialist d/f/m

Branch: Building services and waste... Branch: Building services and waste disposal


Specialist in factory optimization and control d/w/m RWE Nuclear GmbH, Factory, Biblis Start at the next possible time, full time, limited to 4 years RWE stands for change, innovative strength and sustainability. As one of the globally leading renewable energy producers, we want to be climate-neutral by 2040 and allow the world to live in a sustainable way. For this we are looking for creators who want to create a sustainable and safe energy future together with us. RWE Nuclear GmbH bundles the nuclear energy savings of the RWE Group. The company with around 1,300 employees is subject to decommissioning and the legally required dismantling of the Biblis, Emsland, Gundremmingen, Lingen and Mülheim-Kärlich mines, as well as the professional packaging of radioactive waste and the use of recycled materials.

.

Your tasks • Your profile • What we offer

Specialist in factory optimization and control d/w/m RWE Nuclear GmbH, Factory, Biblis Start at the next possible time, full time, limited to 4 years RWE stands for change, innovative strength and sustainability. As one of the globally leading renewable energy producers, we want to be climate-neutral by 2040 and allow the world to live in a sustainable way. For this we are looking for creators who want to create a sustainable and safe energy future together with us. RWE Nuclear GmbH bundles the nuclear energy savings of the RWE Group. The company with around 1,300 employees is subject to decommissioning and the legally required dismantling of the Biblis, Emsland, Gundremmingen, Lingen and Mülheim-Kärlich mines, as well as the professional packaging of radioactive waste and the use of recycled materials.

Head of a project for digitalization and automation in the field of logistics and factory Support and further development of the RVP system Analysis of existing processes and identification of optimization potential Development and implementation of a control concept for logistics Cooperation with internal and external interfaces for process optimization (vote with planning, logistics, release and radiation protection) Development and implementation of measures to reduce costs, increase efficiency and transparency

Completed studies in the field of economic engineer or similar discipline or comparable training First experience in the field of logistics or production planning/control desirable Analytical thinking and a structured working method Basic knowledge of radiation protection and control activities Teamability and Communication Strength Own initiative and solution-oriented thinking

At RWE you will find all the advantages of a large technology group. And something more important: openness and real teamwork. Because we are open to the future and build on the strengths of each individual. We appreciate his work and opinion, listen, conduct active ideas management and are in direct exchange. Respect, appreciation and mutual trust, all of which shape the cooperation in the international RWE team. .

Location

ava RWE Nuclear GmbH
68647  Biblis
Germany

The text of this ad was translated from German into English using an automatic translation system and may contain semantic and lexical errors. Therefore, it should be used for introductory purposes only. For more detailed information, see the original text of the ad at the link below.

For more information read the original ad

Permanent link to this ad

Ad Id