0Technical Operations Management (m/f/d)
Zweckverband Müllheizkraftwerk Stadt und Landkreis Bamberg | Germany | 96xxx Bamberg | Permanent position | Full time | Published since: 29.05.2026 on stepstone.de

Technical Operations Management (m/f/d)

Branch: Building services and waste... Branch: Building services and waste disposal


The MHKW was put into operation in 1978 and has since developed steadily. The plant with three lines takes over approx. 120,000 tons of residual waste from the area of the association members City and Landkreis Bamberg and municipal partnerships. The co-incineration of sewage sludge, the production of electricity and district heating and the operation of a separate district heating network complements the thermal waste treatment. Circa 90 employees ensure the efficient operation of the MHKW and the long-term disposal security for municipalities. In the course of a succession regulation, a human and professionally convincing leadership personality is sought. At the Purpose of the city and district of Bamberg, the site of the

at the waste power plant (MHKW) Bamberg to recompensate. .

Your tasks • Your profile • What we offer

The MHKW was put into operation in 1978 and has since developed steadily. The plant with three lines takes over approx. 120,000 tons of residual waste from the area of the association members City and Landkreis Bamberg and municipal partnerships. The co-incineration of sewage sludge, the production of electricity and district heating and the operation of a separate district heating network complements the thermal waste treatment. Circa 90 employees ensure the efficient operation of the MHKW and the long-term disposal security for municipalities. In the course of a succession regulation, a human and professionally convincing leadership personality is sought. At the Purpose of the city and district of Bamberg, the site of the

at the waste power plant (MHKW) Bamberg to recompensate.

Organisation of a legal, economic and proper operation Planning and control of technical projects and acceptance of works and services Participation in approval procedures relating to technical issues further development of the maintenance strategy and maintenance of existing plants; Coordination of maintenance work, repairs and troubleshooting to minimize downtime Future-oriented technical orientation and development of the MHKW components Continuous optimization of the systems with regard to efficiency and cost-effectiveness Responsibility for the professional personnel use of employees in the MHKW Bamberg, development of operating instructions Cooperation with internal and external institutions Responsibility for compliance with the technical provisions of occupational safety, environmental legislation and administrative requirements Participation in committee work in coordination with management

Technical/scientific university degree or comparable qualification Multiannual professional experience and proof of management responsibility preferably in the area of a waste incineration plant Leadership with clear communication and social competence Entrepreneurial and responsible thinking and action

Contact

ava Zweckverband Müllheizkraftwerk Stadt und Landkreis Bamberg
Rheinstr. 6, 96052  Bamberg
Germany
show e-mail

The text of this ad was translated from German into English using an automatic translation system and may contain semantic and lexical errors. Therefore, it should be used for introductory purposes only. For more detailed information, see the original text of the ad at the link below.

For more information read the original ad

Permanent link to this ad

Ad Id