0Civil Engineer Urban Drainage (m/f/d)
Stadt Norderstedt | Germany | 22xxx Norderstedt | Permanent position | Full time | Published since: 29.07.2026 on stepstone.de

Civil Engineer Urban Drainage (m/f/d)

Branch: Public relations Branch: Public relations


As a lively and innovative city with more than 85,000 people, Norderstedt is a pleasant living and living environment. Transport between the north and the Baltic Sea, with a direct connection to the city centre of Hamburg and with all the secondary schools in the village – Norderstedt offers a diverse cultural life. The following point shall be placed at the next time:

39 hours/week, pay group 11 TVöD

Your tasks • Your profile • What we offer

Completed studies as civil engineerin (Bachelor) or Dipl.-Ingenieurin (FH or TH) in the field of sewer construction, water construction, civil engineering, etc. Experience with or in a municipal building administration is desirable German language skills (min. C1 level) Important competences: Knowledge of drainage Self-employed, systematic and holistic work high degree of organisational capacity and flexibility safe, binding appearance and customer-oriented behavior pronounced communicative skills / negotiation skills social and methodological competence economic thinking and action good EDV knowledge (e.g. Word, Excel, Power Point, Outlook, etc.) The willingness to participate in regular appointments also outside the regular working time (in the evening hours and, if necessary, on weekends) is assumed. The same applies to the willingness to participate in streamed meetings.

Norderstedt is growing and with it the requirements for a sustainable and efficient drainage infrastructure. As an employee (m/w/d) in the field of urban drainage, you are actively involved in the planning, development and implementation of future-oriented solutions for urban drainage. You help to improve protection against flooding and promote sustainable use of rainwater. Become part of a dedicated team and design the technical infrastructure of a modern and growing city. Planning (performance phases 1–9 HOAI), implementation and monitoring of urban dewatering measures (small and rainwater channels, channel remediation in the inliner process, thickening systems) including construction supervision, construction monitoring and documentation with associated object support Coordination and implementation of the maintenance of drainage systems Implementation and control of civil engineering measures with/without the inclusion of freelance engineers Planning and implementation of civil engineering measures on urban properties in cooperation with the competent offices Participation in the monitoring and updating of the channel information system Monitoring and control of dewatering concepts of private investors in the context of building plan procedures, including dewatering technology testing of construction applications in the course of construction permit procedures Participation in the planning and coordination of the legally required self-monitoring according to the SÜVO - sewage systems (tightness testing of the channels, functional testing of the buildings and rain retention basins) as well as planning and implementing measures based on the test results planning and the subsequent continuous updating of the city-wide general drainage concept Development of proposals to include dewatering and civil engineering projects in urban households Presentation of sewer and water engineering measures and/or drainage concepts in political bodies and/or public events and trade fairs.

Grants for ÖPNV or bicycle leasing Operational health management Training and further qualification Flexible working time arrangements Good training opportunities Tariff-based payment Equal opportunities and integration Compatibility of family and occupation

Location

ava Stadt Norderstedt
22846  Norderstedt
Germany

The text of this ad was translated from German into English using an automatic translation system and may contain semantic and lexical errors. Therefore, it should be used for introductory purposes only. For more detailed information, see the original text of the ad at the link below.

For more information read the original ad

Permanent link to this ad

Ad Id